2010 - 2018

Indeed, too much time passed between 1929 and 2010, when the first set of upgrades began at Reid Hall. Before 2010, the center had been kept "dans son jus," as it were: electrical upgrade in the 80's, some interior decoration in 2000, façade paint in 2006.  In 2010, the back gardens were paved; old tree trunks were removed, and the overgrown bushes were removed. Then, it seems as if every summer was a construction moment. But the major repairs occured betwee 2016 and 2018. 

First Couryard

Roof over the Chevreuse building and interior staircases and hallways

Façades of the Chevreuse building and classrooms

Grande Chaumière building was entirely renovated to make way for the Institute of Ideas and Imagination.